Quick to Build & Assemble
Smart logistic carbon neutral solutions, are applied
where large volumes of Pod units are required within limited time
frames. The prefabricated Pods are quick to build and can be almost
literally parachuted on site within 20 weeks from receipt of planning
consent and placement of order. The quick delivery, assembly and
fitting out of buildings can be, completed substantially faster
than standard construction methods.
|